Okorder Waterproofing Finished Materials is to point to besmear to brush in the buildings on the surface, the evaporation of the solvent or water or two component chemical reaction to form a layer of thin film.
The palisade structure of the building to prevent rain, snow and groundwater seepage; To prevent the moisture in the air, steam and other harmful gases and liquids of erosion; To prevent water infiltration turn separated structure. The anti seepage, leakage and erosion of materials referred to as waterproof material.
The construction technology
1, the liquid additives into clean mixing container, and then slowly add powder while stirring in proportion, fully stirring for 3 to 5 minutes until the generated, glutinous rice dough evenly mucilage, and finished in the operation time. Recommend the use of mechanical stirring (400-500 revolutions per minute), in order to obtain the best mixing effect; 2, use roller, brush will paste evenly on the bottom of the processed material, depending on the requirement of the performance and the use environment coating layer 2 or layer 2 above; General engineering waterproof layer thickness to 1 mm, thickness of underground engineering construction standard requirement for 1.5 2 mm; 3, after a layer, must stay the slightly dry solid (just not glue the hand), and then do the second floor, usually takes 1 to 3 hours, depending on the temperature of the compactness of the base and at the time. If more than 24 hours, or coating has been cured, on which the coating layer 2, must use water to wet the surface; 4, curing curing: paste the next day, after besmear advice with fine water mist or wet cloth cover coating 2-3 days, then closed water test; For long-term water tank should be its empty water after two weeks; 5, slurry mixture generally should be finished in 1 hour, appear solidification material not to use; 6, do not mix into stirring, also do not arbitrarily change the proportion of the emulsion.
Matters needing attention
1, construction temperature should be between 5 ℃ and 35 ℃;
2, the deployment of a good pulp should be finished in 1 hour;
3, cold areas or under the condition of low temperature, please pay attention to the freeze storage products, liquid components of the storage temperature is not lower than 0 ℃;
4, when using, don't mixed with water or other materials in this product;
5, construction use appropriate protective measures, such as gloves, etc.
Related to share: https://plus.google.com/108150829397000379939/posts/RNL6VkWBEiP
The palisade structure of the building to prevent rain, snow and groundwater seepage; To prevent the moisture in the air, steam and other harmful gases and liquids of erosion; To prevent water infiltration turn separated structure. The anti seepage, leakage and erosion of materials referred to as waterproof material.
The construction technology
1, the liquid additives into clean mixing container, and then slowly add powder while stirring in proportion, fully stirring for 3 to 5 minutes until the generated, glutinous rice dough evenly mucilage, and finished in the operation time. Recommend the use of mechanical stirring (400-500 revolutions per minute), in order to obtain the best mixing effect; 2, use roller, brush will paste evenly on the bottom of the processed material, depending on the requirement of the performance and the use environment coating layer 2 or layer 2 above; General engineering waterproof layer thickness to 1 mm, thickness of underground engineering construction standard requirement for 1.5 2 mm; 3, after a layer, must stay the slightly dry solid (just not glue the hand), and then do the second floor, usually takes 1 to 3 hours, depending on the temperature of the compactness of the base and at the time. If more than 24 hours, or coating has been cured, on which the coating layer 2, must use water to wet the surface; 4, curing curing: paste the next day, after besmear advice with fine water mist or wet cloth cover coating 2-3 days, then closed water test; For long-term water tank should be its empty water after two weeks; 5, slurry mixture generally should be finished in 1 hour, appear solidification material not to use; 6, do not mix into stirring, also do not arbitrarily change the proportion of the emulsion.
Matters needing attention
1, construction temperature should be between 5 ℃ and 35 ℃;
2, the deployment of a good pulp should be finished in 1 hour;
3, cold areas or under the condition of low temperature, please pay attention to the freeze storage products, liquid components of the storage temperature is not lower than 0 ℃;
4, when using, don't mixed with water or other materials in this product;
5, construction use appropriate protective measures, such as gloves, etc.