Secure the ladder scaffolding is mainly composed of vertical rod, bar, diagonal, horizontal brace, plunger, base, adjustable U, foot pedals, ladders, skirting board, and other supporting artifacts. Parts installation using method is as follows:
1. Inserted into the bottom of the vertical pole adjustable base, used as a supporting system, vertical height adjustment and expand the pressure surface, the force for the foundation, by the screw and the plate welding and become, adjustable base is not too high, lest cause safety accidents emerge from the stud.
2. The stud is a major component under vertical load. On stud fitting the distance of every 495 welding a row pin buckle, used to install rail, cross arm, or diagonal. Bolt directly welding on the top of the vertical bar, make sure no missing.
3. The bar is the framework level of bearing components. It through the pin connected to the vertical bar, because the pin is woven with iron, make both connection has excellent mechanical strength and high performance of self-locking.
4. The cross arm is framework designed to put the ladder and level bearing and pedal artifacts. It does this by pin connected to the stud.
Placed on the ladder, up and down for construction personnel.
6. The foot pedal is on channel used for construction, operation platform, bridge plate.
7. The diagonal is to strengthen the framework of artifacts. It is made of special bevel joint connection on the stud pin clasp.
8. In order to ensure the safety of construction personnel, poling every 495 should be installed on the rail, the ladder are placed on both sides armrest, additional security would climb the ladder of diagonal also want to put all around, to strengthen the stability of the whole frame.
9. Security gym every 1.5 m put a zigzag stairs with footfall, every 4 to 5 meters should be placed retaining wall, the biggest erection height is 100 meters.
This article provided by OKorder, reproduced please indicate:http://www.okorder.com/ladders_pl37140.html
1. Inserted into the bottom of the vertical pole adjustable base, used as a supporting system, vertical height adjustment and expand the pressure surface, the force for the foundation, by the screw and the plate welding and become, adjustable base is not too high, lest cause safety accidents emerge from the stud.
2. The stud is a major component under vertical load. On stud fitting the distance of every 495 welding a row pin buckle, used to install rail, cross arm, or diagonal. Bolt directly welding on the top of the vertical bar, make sure no missing.
3. The bar is the framework level of bearing components. It through the pin connected to the vertical bar, because the pin is woven with iron, make both connection has excellent mechanical strength and high performance of self-locking.
4. The cross arm is framework designed to put the ladder and level bearing and pedal artifacts. It does this by pin connected to the stud.
Placed on the ladder, up and down for construction personnel.
6. The foot pedal is on channel used for construction, operation platform, bridge plate.
7. The diagonal is to strengthen the framework of artifacts. It is made of special bevel joint connection on the stud pin clasp.
8. In order to ensure the safety of construction personnel, poling every 495 should be installed on the rail, the ladder are placed on both sides armrest, additional security would climb the ladder of diagonal also want to put all around, to strengthen the stability of the whole frame.
9. Security gym every 1.5 m put a zigzag stairs with footfall, every 4 to 5 meters should be placed retaining wall, the biggest erection height is 100 meters.