1, what is the distinguishing feature of aluminous model worked brass fitting?
Our pipe fittings are made from brass forging nickel plating after finishing manufacturing, the advantage is not produced by increase use time of verdigris, pipe fittings within the C ring is one of the important factors that control water leakage, we C ring on the edge of the slope and the axis into 30 degrees, the calculation is the most scientific point of view, can maximum limit to prevent leakage of our rubber mat and aprons is three yuan has C rubber, can effectively prevent leakage. Other brass nickel plated pipe and beautiful appearance.
2, aluminum-plastic pipe materials using MDPE (medium density polyethylene) and PE - X (degree of crosslinking polyethylene) what's the difference? Why not crosslinked material?
The molecular structure of the medium density MDPE is linear structure, molecular structure of crosslinking is mesh, crosslinked molecular structure is more stable. Medium density pipe compared with crosslinked pipes, medium density of steel tubes without crosslinking thermal performance is good, but the crosslinking tube is faulty, not suitable for drinking water supply, also due to the use of silane crosslinking process agent must have a certain reaction process, are not suitable for mass production.
3, the service life of the aluminium tube is how many years?
In the use of pressure and temperature under normal use for 50 years.
20. Aluminum tube surface conversion, affect the service life?
If the scratches are too deep, it is recommended that the truncation, using pipe connection, avoid influence normal tube after use.
4, how much is a meter AL can?
Specific price according to different specifications please consult local distributor or agent.
Our pipe fittings are made from brass forging nickel plating after finishing manufacturing, the advantage is not produced by increase use time of verdigris, pipe fittings within the C ring is one of the important factors that control water leakage, we C ring on the edge of the slope and the axis into 30 degrees, the calculation is the most scientific point of view, can maximum limit to prevent leakage of our rubber mat and aprons is three yuan has C rubber, can effectively prevent leakage. Other brass nickel plated pipe and beautiful appearance.
2, aluminum-plastic pipe materials using MDPE (medium density polyethylene) and PE - X (degree of crosslinking polyethylene) what's the difference? Why not crosslinked material?
The molecular structure of the medium density MDPE is linear structure, molecular structure of crosslinking is mesh, crosslinked molecular structure is more stable. Medium density pipe compared with crosslinked pipes, medium density of steel tubes without crosslinking thermal performance is good, but the crosslinking tube is faulty, not suitable for drinking water supply, also due to the use of silane crosslinking process agent must have a certain reaction process, are not suitable for mass production.
3, the service life of the aluminium tube is how many years?
In the use of pressure and temperature under normal use for 50 years.
20. Aluminum tube surface conversion, affect the service life?
If the scratches are too deep, it is recommended that the truncation, using pipe connection, avoid influence normal tube after use.
4, how much is a meter AL can?
Specific price according to different specifications please consult local distributor or agent.